hanifah@zee-eng.com
mohd.izzuan@zee-eng.com
herman.perera@zee-eng.com
PT. ZEE Indonesia
LinkedIn
ARCO Was looking into ways of reducing pipeline installation costs specially for infield short lengths. In LL4A project ZEE...
ZEE’s Scope of Work ZEE’s scope was to design the pipelay “firing line” including the floating stinger. Conceptual...
Santos required an FPSO to operate in their fields in Indonesia. The Contract was awarded to PT Pulau Kencana Raya and...
The new terminal was relocated approximately 1.5km from the existing position. The project involved the installation of a...
The project was executed via Sempec/ZEE office in Jakarta and the fabrication of the Platforms were carried in Kencana Yard in...
The project including on-shore Gathering lines, Refining & Fractionating unit onshore Trunk lines, HDD at shore, 3...