Project Description

A pipeline bundle 8” & 4” was assembled on-shore. The length of the bundle was 2.1 km. The bundled was towed 65 km offshore and installed between 2 platforms.

Client: ARCO Indonesia (Operator).

January 1, 2016

  • arco2
  • arco3
  • arco4

ARCO Was looking into ways of reducing pipeline installation costs specially for infield short lengths.
In LL4A project ZEE proposed the Rentis Method. A pipeline bundle 8” & 4” was assembled on-shore. The length of the bundle was 2.1 km. The bundled was towed 65 km offshore and installed between 2 platforms.

ZEE’s Scope of Work

  • Conceptual study
  • Detail Engineering
  • Inplace Engineering
  • Installation Engineering
  • Project management
  • Cost Estimation
  • Offshore Installation supervision