ARCO Was looking into ways of reducing pipeline installation costs specially for infield short lengths.
In LL4A project ZEE proposed the Rentis Method. A pipeline bundle 8” & 4” was assembled on-shore. The length of the bundle was 2.1 km. The bundled was towed 65 km offshore and installed between 2 platforms.
ZEE’s Scope of Work
- Conceptual study
- Detail Engineering
- Inplace Engineering
- Installation Engineering
- Project management
- Cost Estimation
- Offshore Installation supervision