Project Description

The overall objective of the Block B Subsea Development was to install facilities for the economic production of gas reserves from a number of reservoirs. This marginal field was developed in an optimized and efficient manner.

Client: OPERATOR – Conoco Philips �

March 21, 2016

  • subsea
  • subsea2
  • subsea3
  • subsea4

 

The overall objective of the Block B Subsea Development was to install facilities for the economic production of gas reserves from a number of reservoirs. This marginal field was developed in an optimized and efficient manner.

ZEE’s Scope of Work

  • To carry out FEED Study of Subsea facilities including
    • Flow lines
    • Subsea Controls
    • Subsea manifolds
    • Existing facilities modifications to Platform & FPSO
  • Compiling Specifications
  • Development of EPCC tender package