-
early2
-
early3
Mansal Offshore was requested by ARCO (Qatar) to provide an Early Production System for 35,000 bbl/day output. The proposal by Mansal was a Rig at the Well Head with interconnected skid mounted process units, a pipeline to SBM and FPSO.
ZEE’s Scope of Work
- Conversion of Rig Muna Deck for the accommodation of the process units, piping, E&I.,
- Structural Modification to Deck,
- Design of new Heli Deck,
- Design of Pipeline,
- Design of PLEM,
- Installation Engineering of SBM,
- Mooring Analysis – SBM, FPSO & Tanker.