The new terminal was relocated approximately 1.5km from the existing position. The project involved the installation of a new PLEM, submarine pipeline from existing PLEM to new PLEM, Installation (Mooring) of SPM and FSO.
ZEE’s Scope of Work:
ZEE was asked to carry out FEED Study Detail Engineering and prepare the technical documents for RFQ.
The study involved the design of:
- Submarine Pipeline
- New PLEM
- Mooring Analysis
– Check the integrity of System and the design of Anchor Piles
- Cost Estimation
- Compiling Technical documents for RFQ