Fsru Jawa-Satu

  • Client :- Jawa Satu Regas
  • Project Type :-

    Offshore

  • Location :-

    Indonesia

Overview

  • Key Firsts: This is Asia’s first large‐scale gas‑to‑power project using an FSRU in which LNG import, regasification and power generation are integrated.
  • Ship‑to‑Ship LNG Transfer: Instead of fixed onshore LNG terminals, the FSRU receives LNG via LNG carriers, with ship‑to‑ship transfer being part of operations.
  • Modularity & Flexibility: FSRU allows relatively faster deployment, less land use onshore compared to full LNG import terminal + large regasification plant onshore.
  • Large‐scale Gas Turbine Integration: The combined cycle power blocks integrated with the FSRU/Natural Gas supply ensures efficiency and relatively lower emissions compared to single cycle or fossil alternatives.
Engineering Services
  • Overall project management
  • Prepared P&IDs, Process Flow Diagrams, and Safety Documents
  • Engineering Design Documentation (Basic & Detailed)
  • Naval Architectural Studies
  • Mechanical Completion and Pre-Commissioning
  • Commissioning and Performance Testing
  • Mooring System design
  • Design of Mooring dolphins

Design of Breasting dolphins