Gas Turbine Generator Replacement
- Client :- Pertamina EP
-
Project Type :-
Offshore
-
Location :-
Indonesia
Overview
- Decommissioning and removal of the existing gas turbine generator unit(s).
- Engineering, procurement, and installation (EPI) of the new GTG system, including associated auxiliaries.
- Integration with existing platform electrical and control systems.
- Upgrades or modifications to structural supports, cable routing, exhaust systems, fuel gas supply, ventilation, and cooling systems (as required).
- Testing, commissioning, and performance validation of the new system.
| Characteristics |
|---|
This replacement is part of Pertamina EP’s strategic efforts to:
- Extend the life of offshore production assets.
- Improve energy efficiency and reduce unplanned downtime.
- Ensure compliance with regulatory requirements related to emissions and safety.
| Engineering Services |
|---|
- Overall project management
- Prepared P&IDs, Process Flow Diagrams, and Safety Documents
- Engineering Design Documentation (Basic & Detailed)
- Site Survey Check of the existing platform
- Modification existing SACS model
- In-Place Analysis
- Fatigue Analysis
- Seismic Analysis
- Pushover Analysis