Gas Turbine Generator Replacement

  • Client :- Pertamina EP
  • Project Type :-

    Offshore

  • Location :-

    Indonesia

Overview

  • Decommissioning and removal of the existing gas turbine generator unit(s).
  • Engineering, procurement, and installation (EPI) of the new GTG system, including associated auxiliaries.
  • Integration with existing platform electrical and control systems.
  • Upgrades or modifications to structural supports, cable routing, exhaust systems, fuel gas supply, ventilation, and cooling systems (as required).
  • Testing, commissioning, and performance validation of the new system.
Characteristics

This replacement is part of Pertamina EP’s strategic efforts to:

  • Extend the life of offshore production assets.
  • Improve energy efficiency and reduce unplanned downtime.
  • Ensure compliance with regulatory requirements related to emissions and safety.
Engineering Services
  • Overall project management
  • Prepared P&IDs, Process Flow Diagrams, and Safety Documents
  • Engineering Design Documentation (Basic & Detailed)
  • Site Survey Check of the existing platform
  • Modification existing SACS model
  • In-Place Analysis
  • Fatigue Analysis
  • Seismic Analysis
  • Pushover Analysis