SMK3 Field Development
- Client :- Total (Indonesia)
-
Project Type :-
Offshore
-
Location :-
Indonesia
Overview
SMK3 field development consists of one wellhead and pipeline. The JM1 platform consists of 3 legged conventional jacket (installed by lift) supporting minimum facility wellhead topside. The transportation weight of the jacket and topside are 701 MT and 880 MT. Both jacket and topsides are loaded out by skidding method.
| Engineering Services |
|---|
· Transportation and Installation Engineering of
-
- Topside
- Jacket
- Piles
- Vent Boom
- Buoyancy Tank Design for Upending