Malong project

  • Client :- MEDCO
  • Project Type :-

    Offshore

  • Location :-

    Indonesia

Overview

Malong fields to be developed by three and one production wells, respectively. The wellhead platform to be installed in each fields. The platform was designed at water depth of 78m with topside lifting weight of 485MT.

The production fluids are delivered to West Natuna Transportation System (WNTS) via HangTuah MoGPU and Belida DPP-A by utilizing existing Malong pipeline.

Engineering Services
  • Design of Substructure,
  • Design of Topside Structure,
  • Transportation and Installation Engineering Support.