Diesel storage terminal & fixed mooring dolphin system.
- Client :- PT.PETRO STORINDO ENERGI
-
Location :-
INDONESIA
Overview
PT. Petro Storindo Energi (PSE) intends to implement a new 75,000 m3 diesel storage terminal & related facilities at Sangatta, Kutai Timur, East Kalimantan. McConnel Dowell have been nominated by PSE to perform onshore and offshore works. PT. Dwisatu Mustika Bumi as MC Dowel subcontractor are responsibility to install the subsea pipeline sistem including loading/unloading facilities at fixed mooring dolphin.
Engineering Services |
---|
- Fixed Mooring Dolphin Study
- Loading & Unloading Subsea Hose
- PLEM
- 20” Loading & Unloading Pipeline
- New Offshore Facility.