Flare System Upgrade

  • Client :- ONGC
  • Location :-

    India

  • Keywords :-

    Flare System

Overview

Overview:

Flare system upgrade carried out at Oil and Natural Gas Corporation (ONGC) Mehsana Asset to enhance overall relief handling capacity, reduce header backpressure, and improve smokeless flaring performance. The upgrade included revalidation of relief loads, hydraulic assessment of the flare network, flare tip capacity enhancement, and instrumentation improvements to ensure higher operational safety, reliability, and environmental compliance.

Engineering Services

      Process Engineering (Main Driver)           

  • Revalidate relief loads (API 520 / 521)
  • Hydraulic analysis of flare header
  • KO drum capacity check
  • Radiation & dispersion study
  • Confirm flare tip capacity

       Mechanical

  • Flare stack structural check
  • Flare tip upgrade (capacity / smokeless)
  • KO drum modifications
  • Seal drum review

        Piping

  • Header resizing or new tie-ins
  • Backpressure verification
  • Stress analysis

     Instrumentation & Controls

  • Steam/air assist control
  • Ignition & flame detection
  • ESD logic update
  • Flare gas monitoring (CEMS if required)

      Civil / Structural / Electrical

  • Foundation and support verification
  • Area classification review
  • Power supply for ignition and controls

    Safety & Compliance

  • HAZOP / LOPA update
  • Environmental permit review