PT. Kilang Pertamina Internasional (KPI) initiated the Diesel Hydrotreater (DHT) Complex as part of its refinery modernization program to reduce diesel sulphur content from 2,500 ppm to 50 ppm in compliance with Indonesia's fuel quality regulations.

Characteristics

ZEE Engineering successfully delivered the complete engineering for the new DHT Complex, including all associated process, utility, and offsite facilities, enabling the production of ultra-low sulphur diesel while supporting the refinery's long-term operational and environmental objectives

Engineering Services

1. General

  • Basis of Design (BoD)
  • Project Execution Plan (PEP)
  • Plot Plan & Terminal Layout

2. Process

  • PFDs & P&IDs
  • Equipment Datasheets (pumps, filters)
  • Cause & Effect & HAZOP Reports

3. Mechanical

  • Storage Tank Design & GA Drawings
  • Pump Sizing & Specs
  • Equipment Layouts

4. Piping

  • Piping Layouts & Isometrics
  • Line List & Valve List
  • Pipe Stress Analysis

5. Civil/Structural

  • Tank Foundations & Bund Walls
  • Pipe Rack & Equipment Supports
  • Drainage & Containment Plans

6. Electrical

  • Single Line Diagrams (SLD)
  • Power & Lighting Layouts
  • Earthing & Lightning Protection

7. Instrumentation & Control

  • Instrument Index & Datasheets
  • Loop Diagrams & I/O List
  • SCADA/PLC Control Logic

8. Safety & Fire Protection

  • Firewater Network Layout
  • Firefighting Equipment Plan
  • ESD & Safety System Design

9. Environmental/Utilities

  • Stormwater & Spill Containment
  • Venting & Vapor Control Design
  • Utility Line Diagrams

10. Construction & Commissioning

  • Material Requisitions (MR)
  • Test Procedures & Commissioning Plans
  • As-Built Drawings & O&M Manuals